Request a demo
← All articles
Industry

A first emissions inventory at an electronics manufacturer

How the fictional demo company Cedarline Instruments built its first GHG inventory: the boundary, the base year, what drove each scope, and the customer requests that started it.

· 5 min read · The ESGBlade team

Cedarline Instruments is the made-up company in every ESGBlade screenshot. It designs and assembles test and measurement instruments: 640 people, $182 million of revenue, a head office in San Jose, an assembly plant in Austin and a distribution centre in Leeds. Its figures are illustrative, but they were produced by the product from demo data, so they show how a first inventory at a mid-sized electronics maker comes together.

This post follows Cedarline from an empty workspace to a signed base year and a second year in review.

Where an electronics maker's emissions come from

Assembly is not a heavy process. Most of the fuel burned on site heats buildings, and the larger share of the footprint sits upstream, in the boards, metal parts and plastics bought from suppliers.

An instruments maker, mapped to the GHG Protocol
Scope 1Natural gas for heating, diesel and gasoline in company vehicles, refrigerant top-ups in air conditioning
Scope 2Grid electricity at the plant, the offices and the distribution centre
Scope 3Category 1 purchased components and services, 4 inbound freight, 6 business travel, 5 waste, 3 grid losses

Who asks, and in what form

For a company this size the first request usually comes from a customer. In the demo it is a medical customer, Northbeam Medical (also fictional), sending a supplier sustainability survey as a spreadsheet of questions. Electronics makers also hear from larger manufacturers who buy their parts, from lenders, and from parent companies that report under CSRD or ISSB-based rules. The questions are similar: which standard you follow, Scope 1 and 2, Scope 3 by category, and whether you have a target.

Step 1: the boundary

Cedarline chose operational control. It has two legal entities, the US company and a UK subsidiary, both owned 100%. Each site has a country, floor area and headcount, and the two US sites have an eGRID subregion: CAMX for San Jose and ERCT for Austin. Leeds uses the UK national grid factor.

Step 2: a period and a base year

One reporting period per year. FY2024 was the first full year with usable bills, so it became the base year. Its total was 3,929 t CO2e: Scope 1 530.6 t, Scope 2 677.5 t (location and market were the same, as Cedarline held no instruments that year) and Scope 3 2,720 t. The sustainability lead, Maya Chen, signed it on the decision record, which locks it.

Reporting periods list showing FY2025 in review at 3,834 t and FY2024 signed as the base year at 3,929 t
In the demo (Cedarline Instruments, fictional): FY2024 is signed and marked as the base year; FY2025 is in review.

Step 3: getting the data in

  • Bills. Dan Okafor in facilities uploaded the gas and electricity PDFs. The reader pulled quantity, unit, service period and account into draft lines, each cited to its page.
  • The purchase ledger. Imported from a spreadsheet template. Each supplier line is matched to a USEEIO industry factor by NAICS, which is how category 1 gets a first figure.
  • Travel and freight. Flights by haul band, hotel nights by country, and freight by mode in ton-miles from the forwarder's report.

Every result stores the factor, its library and edition, and the arithmetic. More on that in every figure traces to a page and a factor.

What drove each scope in FY2025

FY2025 came to 3,833.8 t, market-based, 94.7 t (2.4%) below the base year. The inventory analyst lists the drivers largest first:

Cedarline FY2025 by category (demo figures)
C1 Purchased goods and services1,984.7 t CO2e
C4 Upstream transport562.6 t CO2e
Stationary combustion411.3 t CO2e
Scope 2 electricity (market)387.0 t CO2e
C6 Business travel223.0 t CO2e
Mobile combustion129.3 t CO2e
Refrigerants58.2 t CO2e
C5 Waste45.8 t CO2e
C3 Fuel and energy31.9 t CO2e
Scope 3 is 2,848.0 t of the total; 70% of it is spend-based.
ScopeFY2024 (base)FY2025What moved it
Scope 1530.6 t598.9 tAustin gas up 36%, Austin refrigerant top-up up 30%
Scope 2677.5 t387.0 t market / 689.5 t locationTexas wind RECs for Austin
Scope 32,720 t2,848.0 tPurchased components, mostly estimated from spend

Scope 2 is reported both ways, and the headline says which basis it used. See location-based and market-based Scope 2.

Answering the customer

The Northbeam survey was imported with 13 questions. The questionnaire responder drafted 7 from the inventory and the evidence documents and marked 6 as Needs input, for example where a policy or target had to be confirmed by a person. One supplier, Halvard Circuit Boards, answered its request with 412.0 t cradle-to-gate against a 503.6 t spend-based estimate; whether to use it is Maya's call. Read answering a customer's sustainability questionnaire for the full flow.

Where people stay in charge

  • The lead signs the base year. Maya Chen signed FY2024 on the decision record, which locks it.
  • Sign-off follows the checks. The supervisor prepares sign-off once no high-severity issue is open, and the lead signs.
  • Supplier figures by choice. Requests are held until a person sends them, and Halvard's 412.0 t replaces the estimate only if Maya chooses to use it.
  • A person confirms policies and targets. Customer questions that need a policy or target are marked Needs input for a person to confirm.

What to do first

  • Pick a consolidation approach and list your entities and sites, with eGRID subregions for US sites
  • Choose the year with the most complete bills as your base year
  • Upload a year of gas and electricity bills and import the purchase ledger
  • Run the agents and clear the high-severity issues before anything else

A first inventory is mostly bills and a ledger. The work is in finding the gaps before a customer does.

Try it on your own data

ESGBlade is free. Tell us about your company and we'll set up a workspace for your first reporting period.

Request a demo