Request a demo
← All articles
Inventory

Scope 1, 2 and 3 from the bills you already have

A first greenhouse gas inventory built from utility bills, fuel statements and the purchase ledger: boundary and sites, three ways in, the factor library, the three scopes and sign-off, shown on a demo company in ESGBlade.

· 6 min read · The ESGBlade team

When a customer, a lender or a parent company first asks for your emissions, the request usually sounds bigger than the work. Most of what a mid-sized company needs for a first inventory is already in its files: the gas and electricity bills, the fuel cards, the refrigerant service reports, the travel bookings and the purchase ledger. The job is to put them inside a boundary, convert each quantity with a published factor, and have someone accountable sign the result.

This post walks through that job in the order you would do it, using the GHG Protocol Corporate Standard and its Scope 2 and Scope 3 guidance. The screenshots come from ESGBlade's demo company, Cedarline Instruments, Inc., a fictional maker of test and measurement instruments with 640 people, a head office in San Jose, an assembly plant in Austin and a distribution centre in Leeds. The figures are illustrative.

Step 1: draw the boundary

Before any number, decide what the inventory covers. The GHG Protocol asks you to pick a consolidation approach: operational control, financial control or equity share. Operational control usually matches the bills you actually receive. Then list the legal entities with their ownership percentage, and the sites under them.

In ESGBlade this is the company profile. Cedarline uses operational control, with two entities (Cedarline Instruments, Inc. in the US and Cedarline Instruments UK Ltd), both 100% owned. Each site records its country, floor area and headcount, and US sites carry their eGRID subregion, which decides the grid factor for location-based Scope 2. San Jose is in CAMX; Austin is in ERCT.

The Company and sites page showing Cedarline's profile with NAICS 334515, 640 employees, $182M revenue and operational control, two legal entities at 100%, and three sites with eGRID region, floor area and people
The boundary in one place: entities, ownership, consolidation approach and sites. A US site without an eGRID subregion is flagged as a data issue.

You also set up reporting periods, one per year, and mark a base year. The global warming potentials used to convert methane, nitrous oxide and refrigerants to CO2e are IPCC AR5 100-year values.

Step 2: get the activity data in

Activity data is the quantity behind each emission: therms, kWh, litres, pounds of refrigerant, dollars of spend, ton-miles. ESGBlade takes it three ways.

Way inWhat it suitsWhat you get
Bills (PDF with a text layer)Utility and fuel billsDraft lines with quantity, unit, service period and account, each cited to its page and the quoted text
Spreadsheet imports (CSV/XLSX)Purchase ledger, travel, fuel, generic activitiesLines from a template, one per row
Manual linesScanned bills, one-off itemsA line you type, with its source

The bill reader is deterministic code, not a language model guessing. The extraction agent can explain what was read and flag doubt, but it never changes a quantity.

Every line starts as a draft. A person confirms it, or excludes it with a reason that stays in the audit trail. Cedarline's FY2025 inventory has 158 activity lines.

The Activity data list with 158 lines, filters for to confirm, confirmed and excluded, and rows for refrigerant, fleet diesel and gasoline with site, period, quantity, source, status and t CO2e
Activity data for FY2025. Each line shows where it came from and whether a person has confirmed it.

Step 3: match each line to a factor

A factor turns a quantity into emissions. ESGBlade carries a versioned library from public sources: the US EPA GHG Emission Factors Hub 2025 (417 factors), US EPA eGRID2023 for grid electricity by subregion, the UK DESNZ conversion factors 2026 (2,248) and US EPA USEEIO 1.3 supply-chain factors (1,016, spend-based by NAICS industry). Every result stores the factor key, the library, the edition and the step-by-step arithmetic. The arithmetic itself is ordinary code, not AI.

When a line can't be calculated because nothing matches, the factor matcher proposes one from the library with its reason, and a person confirms it. A factor confirmed for a kind of line is offered next time. The detail is in every figure traces to a page and a factor.

Step 4: read the three scopes

Cedarline FY2025, t CO2e
Scope 1: 598.9 tFuel burned and gases released on your own sites: stationary combustion 411.3, mobile 129.3, refrigerants 58.2
Scope 2: 387.0 t market / 689.5 t locationPurchased electricity, steam and heat, reported both ways
Scope 3: 2,848.0 tThe value chain: purchased goods 1,984.7, upstream transport 562.6, business travel 223.0, waste 45.8, fuel and energy 31.9
Illustrative figures from the demo. The headline total is 3,833.8 t, using market-based Scope 2.

Scope 1 is what you burn or leak yourself. For Cedarline: natural gas, vehicle fuel and refrigerant top-ups (mass times GWP).

Scope 2 is the electricity, steam and heat you buy. It is reported location-based, using the grid's average factor, and market-based, using the contracts and certificates you hold. Cedarline bought Texas wind RECs for Austin, which is why its market-based figure is lower. See location-based and market-based Scope 2.

Scope 3 is the rest of the value chain. ESGBlade calculates categories 1 (purchased goods and services), 2 (capital goods), 3 (fuel- and energy-related, with transmission and distribution losses derived from electricity automatically), 4 (upstream transportation), 5 (waste) and 6 (business travel). For a first inventory most of category 1 comes from spend: 70% of Cedarline's Scope 3 is spend-based. That is a starting point, covered in spend-based Scope 3 and when to replace it.

The FY2025 inventory page with tiles for the 3,834 t total, 598.9 t Scope 1, 387.0 t market and 689.5 t location Scope 2, 2,848 t Scope 3 and 6 issues, a warning headed Before this period can be signed, monthly stacked bars and a by-scope donut
The FY2025 inventory, down 94.7 t (2.4%) against FY2024.

Step 5: clear the checks and sign

The data quality agent checks for missing months per site and fuel, bills entered twice, outliers of 30% or more against the prior period, estimated lines, lines that can't be calculated and US sites without an eGRID subregion. Cedarline's FY2025 period has six open issues, two of them high: Leeds has no electricity bill for September 2025, and San Jose has two gas lines for the same 30 days in June. How to work through them is in the missing bill and the bill entered twice.

From files to a signed period
BoundaryEntities, sites, base year
Activity dataBills, imports, manual lines
FactorsVersioned library, trace stored
ChecksGaps, duplicates, outliers
Sign-offLead signs on the decision record

Controls in Rules Studio decide what blocks sign-off, for example "a high-severity data issue is open". The supervisor agent runs the controls and either prepares the lead's sign-off or says what blocks it. When the sustainability lead signs, the period is locked on the decision record until someone reopens it.

Agents prepare; people decide

None of the ten agents acts on its own. Each prepares a decision that a person accepts, rejects or asks about. See the agents.

Where people stay in charge

  • A person confirms every line. Each line starts as a draft; a person confirms it, or excludes it with a reason that stays in the audit trail.
  • Arithmetic is code. Emissions are calculated by deterministic code from the confirmed lines and the factor library, never by the model.
  • The lead signs. When the controls clear, the lead signs on the decision record and the period is locked.
  • Assurance and filing stay with you. A signed period is your company's sign-off; your assurance provider gives assurance, and your company files where it needs to.

Before you start

  • You have chosen a consolidation approach and listed entities and sites
  • Twelve months of electricity and fuel bills per site, as PDFs or a list
  • Refrigerant service records with the gas and mass added
  • A purchase ledger export with supplier, amount and currency
  • One person who will sign the period

Start with the bills you have, put every number inside a boundary, and let a person sign what the checks have cleared.

Try it on your own data

ESGBlade is free. Tell us about your company and we'll set up a workspace for your first reporting period.

Request a demo