When a customer, a lender or a parent company first asks for your emissions, the request usually sounds bigger than the work. Most of what a mid-sized company needs for a first inventory is already in its files: the gas and electricity bills, the fuel cards, the refrigerant service reports, the travel bookings and the purchase ledger. The job is to put them inside a boundary, convert each quantity with a published factor, and have someone accountable sign the result.
This post walks through that job in the order you would do it, using the GHG Protocol Corporate Standard and its Scope 2 and Scope 3 guidance. The screenshots come from ESGBlade's demo company, Cedarline Instruments, Inc., a fictional maker of test and measurement instruments with 640 people, a head office in San Jose, an assembly plant in Austin and a distribution centre in Leeds. The figures are illustrative.
Step 1: draw the boundary
Before any number, decide what the inventory covers. The GHG Protocol asks you to pick a consolidation approach: operational control, financial control or equity share. Operational control usually matches the bills you actually receive. Then list the legal entities with their ownership percentage, and the sites under them.
In ESGBlade this is the company profile. Cedarline uses operational control, with two entities (Cedarline Instruments, Inc. in the US and Cedarline Instruments UK Ltd), both 100% owned. Each site records its country, floor area and headcount, and US sites carry their eGRID subregion, which decides the grid factor for location-based Scope 2. San Jose is in CAMX; Austin is in ERCT.

You also set up reporting periods, one per year, and mark a base year. The global warming potentials used to convert methane, nitrous oxide and refrigerants to CO2e are IPCC AR5 100-year values.
Step 2: get the activity data in
Activity data is the quantity behind each emission: therms, kWh, litres, pounds of refrigerant, dollars of spend, ton-miles. ESGBlade takes it three ways.
| Way in | What it suits | What you get |
|---|---|---|
| Bills (PDF with a text layer) | Utility and fuel bills | Draft lines with quantity, unit, service period and account, each cited to its page and the quoted text |
| Spreadsheet imports (CSV/XLSX) | Purchase ledger, travel, fuel, generic activities | Lines from a template, one per row |
| Manual lines | Scanned bills, one-off items | A line you type, with its source |
The bill reader is deterministic code, not a language model guessing. The extraction agent can explain what was read and flag doubt, but it never changes a quantity.
Every line starts as a draft. A person confirms it, or excludes it with a reason that stays in the audit trail. Cedarline's FY2025 inventory has 158 activity lines.

Step 3: match each line to a factor
A factor turns a quantity into emissions. ESGBlade carries a versioned library from public sources: the US EPA GHG Emission Factors Hub 2025 (417 factors), US EPA eGRID2023 for grid electricity by subregion, the UK DESNZ conversion factors 2026 (2,248) and US EPA USEEIO 1.3 supply-chain factors (1,016, spend-based by NAICS industry). Every result stores the factor key, the library, the edition and the step-by-step arithmetic. The arithmetic itself is ordinary code, not AI.
When a line can't be calculated because nothing matches, the factor matcher proposes one from the library with its reason, and a person confirms it. A factor confirmed for a kind of line is offered next time. The detail is in every figure traces to a page and a factor.
Step 4: read the three scopes
Scope 1 is what you burn or leak yourself. For Cedarline: natural gas, vehicle fuel and refrigerant top-ups (mass times GWP).
Scope 2 is the electricity, steam and heat you buy. It is reported location-based, using the grid's average factor, and market-based, using the contracts and certificates you hold. Cedarline bought Texas wind RECs for Austin, which is why its market-based figure is lower. See location-based and market-based Scope 2.
Scope 3 is the rest of the value chain. ESGBlade calculates categories 1 (purchased goods and services), 2 (capital goods), 3 (fuel- and energy-related, with transmission and distribution losses derived from electricity automatically), 4 (upstream transportation), 5 (waste) and 6 (business travel). For a first inventory most of category 1 comes from spend: 70% of Cedarline's Scope 3 is spend-based. That is a starting point, covered in spend-based Scope 3 and when to replace it.

Step 5: clear the checks and sign
The data quality agent checks for missing months per site and fuel, bills entered twice, outliers of 30% or more against the prior period, estimated lines, lines that can't be calculated and US sites without an eGRID subregion. Cedarline's FY2025 period has six open issues, two of them high: Leeds has no electricity bill for September 2025, and San Jose has two gas lines for the same 30 days in June. How to work through them is in the missing bill and the bill entered twice.
Controls in Rules Studio decide what blocks sign-off, for example "a high-severity data issue is open". The supervisor agent runs the controls and either prepares the lead's sign-off or says what blocks it. When the sustainability lead signs, the period is locked on the decision record until someone reopens it.
Agents prepare; people decide
None of the ten agents acts on its own. Each prepares a decision that a person accepts, rejects or asks about. See the agents.
Where people stay in charge
- A person confirms every line. Each line starts as a draft; a person confirms it, or excludes it with a reason that stays in the audit trail.
- Arithmetic is code. Emissions are calculated by deterministic code from the confirmed lines and the factor library, never by the model.
- The lead signs. When the controls clear, the lead signs on the decision record and the period is locked.
- Assurance and filing stay with you. A signed period is your company's sign-off; your assurance provider gives assurance, and your company files where it needs to.
Before you start
- You have chosen a consolidation approach and listed entities and sites
- Twelve months of electricity and fuel bills per site, as PDFs or a list
- Refrigerant service records with the gas and mass added
- A purchase ledger export with supplier, amount and currency
- One person who will sign the period
Start with the bills you have, put every number inside a boundary, and let a person sign what the checks have cleared.
Try it on your own data
ESGBlade is free. Tell us about your company and we'll set up a workspace for your first reporting period.
Request a demo

