Request a demo
← All articles
Agents

Agents prepare, people decide

ESGBlade's ten agents do the reading, checking and drafting, then stop at a prepared decision with Accept, Reject and Ask. How the L2 ceiling, the rules fallback and number grounding keep a person in charge.

· 5 min read · The ESGBlade team

Most of the time spent on a greenhouse gas inventory is not judgement. It is sorting uploads, reading bills, chasing the one site that hasn't sent September, noticing that a gas bill went in twice, and drafting the same request to suppliers. That work is a good fit for software. The judgement, whether a figure is right and whether a period can be signed, belongs to a named person in your company.

ESGBlade splits the work along that line. Ten agents do the preparation. Each one stops at a prepared decision, and a person answers it. This post explains how that works, using the fictional demo company Cedarline Instruments and its sustainability lead, Maya Chen.

The ten agents

The agents follow the order of the work: collect, calculate and check, report and sign.

AgentWhat it preparesWhat it never does
IntakeSorts uploads by site and month; drafts the request to site owners for missing billsInvent a document
ExtractionTurns bills and fuel statements into lines cited to the pageChange a quantity
Factor matcherProposes a factor or NAICS industry for lines that can't be calculated, with the reasonUse a factor outside the library
Data qualityRecalculates, reads the checks, prepares fixes and follow-upsResolve an issue by itself
Inventory analystExplains what drives each scope and what moved, largest firstDo the arithmetic; code does that
Supplier outreachRanks suppliers and drafts data requestsSend a message; each is held
SupervisorRuns the controls; prepares sign-off or says what blocks itSign the period
Disclosure writerDrafts ESRS E1, ISSB S2, SB 253 and GRI 305 datapointsInvent targets, policies or commitments
Questionnaire responderAnswers imported customer questionnaires with citationsAnswer what the evidence doesn't support
Materiality assistantProposes the climate (E1) scores from the inventoryApprove the assessment
The Agent catalogue with ten agents grouped in three steps, collect, calculate and check, and report and sign, a notice that the model is switched off, and each card stating what that agent never invents
The catalogue. Each card says what the agent never invents. Here the model is switched off, so every agent runs on its rules.

What a prepared decision looks like

Maya opens the FY2025 period and chooses Run the agents. Each agent does its part in turn. When the run finishes, the Agents tab shows the analyst's read of the period and a short list of prepared decisions. For Cedarline the run prepared these:

  • Ask for the bills behind 2 gaps (Leeds electricity and gas for September 2025).
  • Deal with 6 data issues.
  • Ask 4 suppliers for data: Halvard, Ostrava, Pemberton and Bluefield.
  • Accept 9 drafted ESRS datapoints.
The FY2025 Agents tab with The analyst's read at the top, prepared decisions to ask for the bills behind 2 gaps and to deal with 6 data issues, each with Accept, Reject and Ask buttons, and The last run listing steps by agent with their status
After a run: the analyst's read, the prepared decisions with Accept / Reject / Ask, and every step the agents took.

Each decision has three answers:

  • Accept carries out what was prepared, for example excluding the second copy of San Jose's June gas bill and logging the follow-ups.
  • Reject leaves things as they are.
  • Ask lets you question the agent before deciding.

Whichever you choose, the answer goes on the decision record with who answered and when. Open a decision and you see exactly what would change.

A prepared decision page titled Deal with 6 data issues, listing the proposed fix to exclude the second copy of a bill and the follow-ups to log, with Accept, Reject and Ask buttons
One prepared decision in full. Nothing in it happens until someone accepts.

Autonomy: L1 to L4, capped at L2

Each agent and each of its actions has an autonomy level:

LevelNameMeaning
L1DraftThe agent drafts; a person does the rest
L2Ask firstThe agent prepares the action and asks
L3Act and tellThe agent acts, then reports
L4ActThe agent acts

In ESGBlade the ceiling for every workspace is L2, Ask first. Whatever level is set on the dial, no agent acts on its own. The dial exists so you can hold an agent lower, at L1, if you want drafts only.

The Autonomy page showing the tenant ceiling of L2 Ask first and a per-agent, per-action dial with L1 Draft, L2 Ask first, L3 Act and tell and L4 Act
The autonomy dial. The ceiling of L2 applies however an individual agent is set.

When the model is switched off

The AI model runs through AWS Bedrock when it is switched on. It can also be switched off entirely. When it is, every agent falls back to its own rules and says so. The data quality agent still finds the gap at Leeds and the duplicate at San Jose, because those checks are rules. What changes is the wording: explanations come from templates rather than drafted prose. In the agent's run trace, the cost line reads $0, rules only.

The arithmetic never depends on the model

Emissions are calculated by deterministic code whether the model is on or off. Agents read, explain and draft; they do not compute tonnes.

Grounding: numbers must come from the facts

A language model can write a sentence with a plausible number that isn't true. ESGBlade checks for that. Each agent is given the facts it may use, such as the period's totals or an issue's details. If a drafted sentence contains a number that is not in those facts, the sentence is thrown away and the rules' wording is used instead. There are tests for this behaviour.

So if the analyst writes that Scope 1 rose to 598.9 t, that figure came from the inventory. If it had written a figure the inventory doesn't contain, you would see the rules' plainer sentence instead.

The decision record

Every agent action ends with a person
Agent preparesWith its reasons and the facts used
Person answersAccept / Reject / Ask
Decision recordWho, when, what changed

The decision record is also where the sustainability lead signs the period and approves disclosures. In the audit trail, agents appear as themselves, with their agent code and autonomy level, so a reviewer can separate what an agent proposed from what a person did. More detail is on the agents page and security.

A typical order for answering

  1. Read the analyst's read for the period.
  2. Answer the data quality decisions first, because they can change the totals.
  3. Send, or edit and send, the requests for missing bills and supplier data.
  4. Review drafted disclosure datapoints once the figures are settled.
  5. Let the supervisor prepare sign-off when no control blocks it.

The data quality step is covered in the missing bill and the bill entered twice, and the supplier step in asking suppliers for their own numbers.

Where people stay in charge

  • Every agent stops at Ask first. No agent acts above L2. Each one prepares a decision, and a person answers Accept, Reject or Ask.
  • Requests wait for a person. Supplier and site requests are held until a person sends them.
  • The lead signs. The sustainability lead signs the period and approves disclosures on the decision record.
  • Rules mode keeps people writing. With the model off, explanations use template wording, and narrative disclosure answers list the passages found in your evidence, marked Needs input for a person to write. Figures from the inventory are drafted either way.

The agents do the reading and the chasing. A named person makes every call that changes a number.

Try it on your own data

ESGBlade is free. Tell us about your company and we'll set up a workspace for your first reporting period.

Request a demo