Request a demo
← All articles
Industry

Medical device suppliers: answering health systems' sustainability questions

Health systems are adding emissions questions to supplier procurement. How a device maker builds the inventory behind the answers, reports market-based Scope 2 and tracks a target.

· 4 min read · The ESGBlade team

Hospitals and health systems have started asking the companies that supply them about emissions. A device maker that has never measured its footprint may find a section of questions in a tender, a supplier survey from a large customer, or a request to state a reduction target. The questions are usually reasonable and specific, and they assume you already have an inventory.

This post covers what a medical device supplier's emissions look like, what health system buyers tend to ask, and how to answer from a signed inventory in ESGBlade.

Who is asking, and how

In several countries, public and private health systems have made commitments on their own emissions, and because much of a health system's footprint sits in what it buys, procurement teams are asking suppliers for data. The form varies: a supplier sustainability questionnaire sent as a spreadsheet, a scored section of a tender, or a requirement to publish a carbon reduction plan. Specific programmes, thresholds and dates differ by country and buyer and have been changing, so read the request in front of you rather than a summary of it.

The common questions are:

  • Do you measure your greenhouse gas emissions, and to which standard?
  • What were your Scope 1 and Scope 2 emissions last year, and on which Scope 2 basis?
  • Do you report Scope 3, and by which categories?
  • Do you have a reduction target, and is it externally validated?
  • What renewable electricity do you buy?

Where a device maker's emissions are

A device maker, mapped to the GHG Protocol
Scope 1Natural gas for heating and process ovens, refrigerant top-ups in clean-room air handling, company vehicles
Scope 2Electricity for moulding, assembly, clean rooms and offices; often the largest of the two operational scopes
Scope 3Category 1 components, resins, sterilisation services and packaging; 4 freight; 6 business travel; 5 waste

Market-based Scope 2

Buyers often ask which basis your Scope 2 figure uses. ESGBlade calculates both. Location-based uses the eGRID subregion for US sites or the national grid factor elsewhere. Market-based uses the instruments you enter: RECs, PPAs, green tariffs or supplier-specific instruments, each with MWh and a certificate reference. The headline uses market-based when any instrument exists and says so.

Questionnaire answers showing market-based Scope 2 of 387.0 t from the inventory and a Scope 3 by category table
In the demo (Cedarline Instruments, fictional): the answer to a market-based Scope 2 question is taken from the inventory (387.0 t), with Scope 3 by category below it.

More on the two bases in location-based and market-based Scope 2.

How ESGBlade handles it, step by step

From bills to an answered survey
InventoryBills, ledger, travel
Sign-offOn the decision record
Import surveyOne question per row
DraftsFrom inventory or evidence, or Needs input
Review and exportWord or PDF
  1. Build the inventory. Sites with eGRID subregions, bills read into lines cited to the page, the ledger and travel imported. Enter REC purchases as market-based instruments.
  2. Run the agents and clear the issues. The data quality agent finds gaps and duplicates; the supervisor won't prepare sign-off while a high-severity issue is open.
  3. Sign the period. The lead signs on the decision record.
  4. Add evidence documents. Your environmental policy, the board paper on the target, an energy programme. The questionnaire responder cites passages from them by page.
  5. Import the survey. A spreadsheet with a column called "question" (optional id and section). Each answer is drafted from the inventory, from evidence, or marked Needs input.
  6. Review every item, fill in what needs input, Mark reviewed, and export to Word or PDF.

Targets are never invented

If a question asks for your target and no document states one, the draft says Needs input. Once a target is set, ESGBlade tracks it as an absolute reduction against a base year. It is a calculator: it does not say whether a target is science-based, and it does not validate one.

For setting up the target, see a reduction target you can track. For the questionnaire flow, answering a customer's sustainability questionnaire.

Where people stay in charge

  • Sign before answering. The lead signs the period on the decision record; the supervisor prepares sign-off once no high-severity issue is open.
  • Targets come from your board. If a question asks for your target and no document states one, the draft says Needs input, and a person writes the board's own wording.
  • A person reviews every item. Fill in what needs input, Mark reviewed, and export to Word or PDF.
  • You submit. Your team sends the answers to the buyer's procurement portal.

What to do first

  • Get the request in writing and note exactly which scopes and year it asks for
  • Collect a year of bills for every site and any REC or green tariff paperwork
  • Gather the documents that state your policy and any target
  • Build and sign the inventory before drafting a single answer

Answer the health system from a signed inventory, and leave blank what you can't support.

Try it on your own data

ESGBlade is free. Tell us about your company and we'll set up a workspace for your first reporting period.

Request a demo