For most mid-sized companies, the biggest part of the footprint is what they buy. Components, materials, contract services, software, freight. Category 1 of Scope 3, purchased goods and services, is usually the largest single category, and it is also the one where you have the least direct data. You know what you paid each supplier. You rarely know what each supplier emitted making what you bought.
The spend-based method bridges that gap. It is the normal place to start, and it is also coarse. This post explains how it works, how ESGBlade applies it, and how to decide where to replace it, using the fictional demo company Cedarline Instruments.
How the spend-based method works
An environmentally extended input-output model estimates the emissions per dollar of output for each industry, including that industry's own supply chain. Multiply what you spent with a supplier by the factor for its industry and you get an estimate of the emissions embodied in what you bought.
ESGBlade uses the US EPA's USEEIO 1.3 supply-chain factors: 1,016 factors, each for an industry identified by its NAICS code. A ledger line for $100,000 of printed circuit boards is matched to the circuit board manufacturing industry and multiplied by its factor.
Two adjustments that matter
- Currency. USEEIO factors are per US dollar. A line in pounds or euros is converted with the exchange rate recorded on that line, so the rate is visible and fixed, not looked up later.
- Price year. The factors are in 2022 dollars. ESGBlade adjusts spend to 2022 with the US CPI-U index before applying the factor. Without this, general inflation alone would look like a rise in emissions.
Capital goods, Scope 3 category 2, are calculated the same way from capital spend. The method is recorded on every line, so you can always see which tonnes are spend-based and which come from distance, mass, fuel or the supplier's own figure.
Getting the ledger in
- Export the year's purchase ledger with supplier name, amount, currency and, if you have it, a description or account code.
- Import it with the purchase ledger spreadsheet template (CSV or XLSX).
- Give each supplier an industry. Where a line can't be calculated because no industry is set, the factor matcher proposes a NAICS industry from the library with its reason; a person accepts or rejects it.
- Confirm the lines. A confirmed match is learned and offered the next time that kind of line appears.
- Exclude spend that isn't in scope, such as taxes or intercompany transfers, with a reason.
Avoid counting things twice
Spend on electricity, fuel, freight or travel that you already measure by activity elsewhere shouldn't also be in the spend lines. Exclude those ledger lines with a reason so the audit trail shows why.
Why 70% spend-based is typical early
Cedarline's FY2025 Scope 3 is 2,848.0 t, and 70% of it is spend-based. That is a normal shape for a first or second inventory. Travel, freight and waste have activity data that is fairly easy to get; purchased goods do not.
The weakness of spend-based figures is that they describe the average supplier in an industry, not your supplier. If you switch to a supplier with a cleaner process at the same price, the spend-based number doesn't move. If prices rise, the number rises even when nothing physical changed (the CPI-U adjustment removes general inflation, not price changes specific to your supplier). For reporting progress on Scope 3, that's a real limit.
Deciding whom to replace first
You don't need every supplier's own data. You need it from the few that make up most of the estimate. ESGBlade's Suppliers page lists every supplier on the purchase ledger, ranked by Scope 3 tonnes, with spend, share and basis.

| Supplier | Scope 3, t CO2e | Basis |
|---|---|---|
| Halvard Circuit Boards | 503.6 | Spend-based ($4.85M spend) |
| Ostrava Metalworks | 441.3 | Spend-based |
| Pemberton Components | 357.4 | Spend-based |
| Bluefield Plastics | 333.0 | Spend-based |
Those four account for more than four-fifths of Cedarline's 1,985 t of supplier emissions. The supplier outreach agent uses the same ranking: it picks the suppliers that make up about 70% of spend-based Scope 3, up to eight, and drafts a data request to each. For Cedarline it prepared requests to these four. Every message is held until a person sends it.
Moving to supplier data
When a supplier answers, its figure is shown beside your spend-based estimate. Halvard answered with 412.0 t cradle-to-gate against the estimate of 503.6 t. A person decides whether to use it; if so, ESGBlade swaps Halvard's spend lines for one supplier-specific line and recalculates. The full process, including the supplier's no-login page and how to undo, is in asking suppliers for their own numbers.

Where people stay in charge
- A person accepts each industry. The factor matcher proposes a NAICS industry with its reason; a person accepts or rejects it.
- Requests wait for a person. The supplier outreach agent drafts requests; the team edits and sends them.
- The supplier's figure by choice. Supplier data replaces the estimate only when someone chooses Use the supplier's figure.
See also every figure traces to a page and a factor for the calculation trace, and industries for how this looks in different sectors.
Spend-based gets you a complete first number. Supplier data, starting with the largest few, makes it yours.